1、 Product Description:
Main functions of the device:
The salt water spray tester is used to test the corrosion resistance of the products after the surface of various materials has undergone corrosion treatment such as electroplating, anodizing, spraying, and antirust oil
Performance indicators and system composition of programmable Salt spray testing machine
Model GC-YW-120B
Volume and size
Nominal internal volume 600 L
Effective size of inner box 1200 × 1000 × 500 W × H × D (mm)
The external space is approximately 1860 × 1160 × 1400 W × H × D (mm) as shown in the figure
Weight 250kg
Maximum power 320KW
Maximum current 1*
Power supply conditions
And power supply AC 220V single-phase R N+protective grounding; The allowable voltage fluctuation range is 10% V;
The allowable frequency fluctuation range is 50 ± 0.5HZ; TN-S power supply or TT power supply
The grounding resistance of the protective grounding wire is less than 4 Ω
Require users to configure corresponding capacity air or power switches for the equipment at the installation site, and this switch must independently control the use of the equipment
performance index
The values measured under the environmental conditions of+25 ℃, relative humidity ≤ 85%, and no sample in the test chamber.
Temperature and humidity range laboratory temperature: RT~ 50℃
Pressure bucket temperature: RT~ 63℃
Relative humidity ≥ 85% HR
Main technical parameters: Temperature resolution: 0.1 ℃
Temperature deviation: ±1℃
Temperature uniformity: 1 ℃
Temperature fluctuation: ± 0.5 ℃
Spray volume (m1/80cm2/h) 1.0~2.0 (collect at least 16 hours and take the average value)
Spray pressure: 1.00 ± 0.01kgf/cm2
PH value: neutral 6.5~7.2 acidic 3.0~3.3
Control time: 1S~9999H can be set arbitrarily
Spray time: 1S~99H can be set arbitrarily
Rest time: 1S~99H can be set arbitrarily
The test meets the standard GB/T 2423.18-2000 Salt Spray Test
GB/T 10125-1997 Salt Spray Test
ASTM.B117-07 Salt Spray Test
JIS H8502 Salt Spray Test
IEC 60068-2-11:1981 Salt spray test
IEC68-2-52 1996 Salt Spray Test
GB/T 12967.3-91CASS Accelerated Acetate Salt Spray Test
GBT 5170-8-2008 Salt Spray Test Equipment
GJB150.11A-2009 Military Equipment Laboratory Environmental Test Methods Salt Spray Test
GB/T2423.17-2008 Salt spray test method
CNS 4159 Test Method of Copper Acetate Salt Water spray for Surface Treatment
CNS 4158 Salt water spray test method for surface treatment
Heating rate laboratory temperature RT →+50 ℃ ≤ 40 min
Pressure bucket temperature RT →+63 ℃ ≤ 35 min
structure characteristics
The box structure laboratory adopts PVC polyethylene board with a thickness of 8mm and a durable temperature of 85 ℃.
The laboratory sealing cover is made of PVC polyethylene board with a thickness of 5mm
The test drug replenishment bottle adopts a hidden water level gauge, which is easy to clean and not easy to break.
The pressure air tank adopts SUS # 304 stainless steel, which has the best insulation effect for high-pressure resistant tanks
The machine base is made of stainless steel welded into a mesh structure
The bottom of the machine is equipped with casters and fixed foot cups for easy movement and positioning
The test material rack adopts a flat indexing rack, which can adjust the angle freely to cover and receive fog on all four sides, and can accommodate a large number of samples
The sealing cover adopts pneumatic type, just click the switch cover button to open and close the sealing cover
The laboratory seal adopts water sealing method to ensure that corrosive gases inside the box do not leak
The control box and test box are integrated, and the left and right structures are easy to operate
The whole machine is a desktop structure with a beautiful appearance
The sealing cover of the box cover laboratory is made of PVC polyethylene board with a thickness of 5mm
Make a top 1100 corner sealing cover
The observation window is made of acrylic sheet
Manual defogging device
Control panel water test indicator, overtemperature indicator, end indicator, spray indicator, demist indicator
Laboratory temperature controller, pressure tank temperature controller, timer, accumulator, programmable timer
Main power switch, operation switch, timing switch, spray switch, demist switch
Distribution control cabinet water filling solenoid valve, spray solenoid valve, demisting solenoid valve, distribution board, cooling fan
Over temperature protector, air saturation pressure tank, spray control valve, single-phase valve, test box switch cover switch
The heating system adopts steam heating method, and the titanium alloy heating tube P.I.D controls the heating to achieve temperature balance
There are two types of water replenishment control systems: manual and fully automatic. Simply connect the tap water pipe to automatically control it, making it easy to use
Note: If there are too many impurities or acidity in tap water, a filter should be installed at the inlet
Drainage system drainage valve control device, manual drainage mode
The spray system adopts Bernoult principle to absorb salt water and then atomize, with uniform atomization degree
No blocking crystallization phenomenon can ensure the standard of continuous testing
The nozzle is made of special glass
Spray mode continuous/intermittent
The spray pressure of the air supply system is adjusted to 1kg/cm2 in two stages. For the first time, the compressed air is adjusted to 2kg/cm2 to enter the saturated barrel for heating, and for the second time, the spray pressure is adjusted to 1kg/cm2
The fully automatic pressure balanced fog removal device of the fog removal system only needs to be connected to the fog removal pipe, and automatically removes fog according to the pressure inside the box
electric control system
Controller LCD display temperature controller, controls the temperature of the laboratory and pressure tank
Temperature input mode button based input
The temperature display can show the set temperature value and the actual temperature value
Work timer digital display timer, unit: seconds, minutes, minutes, hours, ten hours switchable, maximum timer
9999 hours, minimum timing of 1 second
Timer setting method key input
Program timer digital display program timer, two sets of time can be set arbitrarily, infinite loop, timing units: seconds, minutes, minutes, hours, ten hours can be switched, each set has a maximum timing of 99 hours and a minimum timing of 1 second
Program setting method: key input
Continuous operation mode
The one-time cumulative timer can monitor the total working time of the machine
Temperature setting range, maximum temperature range, upper and lower limits of 5 ℃
The panel displays the set temperature value, the current temperature value, the set time, the current time, the total working time of the machine, the abnormal overtemperature indicator, the abnormal water shortage indicator, the end of operation indicator, the spray status indicator, and the defogging status indicator
Safety protection device
Extreme over temperature protection and water shortage protection for the test chamber
Saturated bucket extreme over temperature protection, water shortage protection
Heating system heating tube dry burning, abnormal water supply, abnormal drainage
Power leakage protection, overload and short circuit protection
Storage environment requirements: The equipment environment temperature should be maintained within 0 ℃ to+25 ℃
The installation site requires that the distance between the left, right, and rear wall panels of the test box and the wall should not be less than 600mm, and the distance between the front and the wall should not be less than 800mm. When transporting equipment, whether it is possible to enter the entrance or passage, elevator, etc., to avoid affecting the progress of your company's project.
Acceptance criteria and third-party verification
1. Acceptance criteria: Technical indicators shall be in accordance with the methods specified in the "Technical Agreement" signed by both parties.
2. Acceptance method: Formal acceptance shall be conducted on the site of the purchaser.
3. If the purchaser needs to invite a third party (verified by the National Environmental testing Equipment Quality Inspection Center and issued a valid inspection report) to participate in the acceptance before leaving the factory, the cost shall be borne by the purchaser. If the first acceptance is not qualified, the cost incurred during the second acceptance after improvement by the supplier shall be borne by the supplier.
4. The customer entrusts the National Environmental Testing Equipment Quality Inspection Center to conduct calibration on their own.